CONSTRUCTION
Project:
Laysen Valley
Location:
Umm Al Hamam - Riyadh
Year:
2022
Scope:
Design, supply and installation/dismantle of Cup-Lock scaffolding for residential towers and bridge over 100.000 sq.m
Project:
Madinah Novotel
Location:
Central Medina
Year:
2022
Scope:
Design, Fabrication and supply of Uni-Form system with area 870 sq.meter for casting of columns, one-side walls and two-side and cup-lock scaffolding for eighteen slabs in madinah city center
Project:
JIS Cranes Maintenance
Location:
Jeddah Islamic Seaport - Jeddah
Year:
2021
Scope:
Design, supply and installation/dismantle of platforms 80 meters above ground for maintenance of five cranes in Jeddah Islamic Seaport
Project:
Corniche Towers
Location:
Corniche - Jeddah
Year:
2020
Scope:
Design and load calculation study for cup-lock scaffolding for slabs of total area 15000m2
Project:
King Avenue Mall
Location:
Northern Obhur - Jeddah
Year:
2019
Scope:
Design,supply and load calculation study for cup-lock scaffolding for slabs of total area100,000m2
Project:
Madinah Road Hotel
Location:
Madinah Road - Jeddah
Year:
2019
Scope:
Design and load calculation study for cup-lock scaffolding for slab of total area4000m2 and elevations of total area 10000m2
Project:
AL ZAHID BUSINESS PARK
Location:
Al Rehaily - Jeddah
Year:
2019
Scope:
Design ,supply and load calculation study for cup-lock scaffolding for slabs of total area7000m2
Project:
Rawdah Towers
Location:
Khalidiyah - Jeddah
Year:
2019
Scope:
Design and supply of uni-form wall and column forms of area3600m2 including the load calculation study, training for workers and supervision on casting of walls and columns
Project:
Haramain High-Speed Railway - Operation Control Center Building
Location:
Jeddah Haramain High Speed Railway Station
Year:
2018
Scope:
Design, installation & dismantle of cup-lock scaffolding on all elevations with platforms every 2m high for installation of curtain wall Total elevations area2700m2
Project:
Haramain High Speed Rail Airport East Interchange
Location:
King AbdulAziz Airport - Jeddah
Year:
2016
Scope:
Design and load calculation study for cup-lock scaffolding for bridges of total length4000m2
Project:
Clock Royal Tower Elevators
Location:
Clock Tower - Makkah
Year:
2015
Scope:
Manufacture of customized cup-lock system with pipe thickness of4mm to stand the load in long shafts ,total volume50000m3
Project:
Headquarters Business Park
Location:
Corniche - Jeddah
Year:
2010
Scope:
Design,supply and technical studies of cup-lock scaffolding for60slabs of total area200,000m2
Project:
King Abdulaziz University
Location:
Jeddah
Year:
1995
Scope:
Design ,supply and technical studies of cup-lock scaffolding for auditoriums and slabs of total area150000m2